Vande Bharat Express: Wiki-Style Reference
The Vande Bharat Express is a semi-high-speed, fully air-conditioned, self-propelled electric trainset designed and built in India and run by Indian Railways. It began as “Train 18” at the Integral Coach Factory (ICF) in Chennai and entered service on 15 February 2019 between New Delhi and Varanasi. Vande Bharat trains are designed for 180 km/h and allowed up to 160 km/h where the track is ready. The daytime Chair Car version has AC Chair Car (CC) and Executive Chair Car (EC) seats in trains of 8, 16 or 20 coaches; an overnight Vande Bharat Sleeper with 3A, 2A and 1A berths started in January 2026. In November 2026 our checked timetables list 85 Vande Bharat routes and 170 services: 82 Chair Car pairs and 3 Sleeper pairs.
On this page
Timetable figures (routes, distances, times, fares) come from our own checked data; every other fact has a source linked next to it and listed under References. The site is independent and not part of Indian Railways or IRCTC.
Infobox
| Vande Bharat Express | |
|---|---|
| Type | Semi-high-speed electric multiple unit (self-propelled trainset), intercity |
| Former name | Train 18 |
| Manufacturer | Integral Coach Factory (ICF), Chennai; Sleeper prototype built at BEML, Bengaluru |
| Designed by | ICF, in-house, in 18 months |
| First service | 15 February 2019, New Delhi – Varanasi (now 22435/22436) |
| First Vande Bharat Sleeper | 17 January 2026 flag-off, Howrah – Kamakhya (27575/27576) |
| Owner and operator | Indian Railways (Ministry of Railways, Government of India) |
| Formation (Chair Car) | 8, 16 or 20 coaches |
| Formation (Sleeper) | 16 coaches: 11 × 3A, 4 × 2A, 1 × 1A |
| Classes | CC and EC (Chair Car); 3A, 2A, 1A (Sleeper) |
| Seats per coach | CC 78 (44 in a driving coach); EC 52 |
| Seats per train | 530 (8 coaches), 1,128 (16), 1,440 (standard 20); Sleeper about 823 berths |
| Design speed | 180 km/h |
| Maximum service speed | 160 km/h, subject to track |
| Fastest average (timetable) | 96.4 km/h, 22435 / 22436 Varanasi – New Delhi |
| Traction | Electric; traction motors spread along the train, driving cab at each end, no separate locomotive |
| Braking | Regenerative braking |
| Safety systems | Kavach train protection, CCTV, automatic plug doors, emergency talk-back units, fire detection |
| Routes (November 2026) | 85 (82 Chair Car, 3 Sleeper) |
| Services (November 2026) | 170 (164 Chair Car, 6 Sleeper) |
| Stations served | 425 |
| Versions | 1 (2019), 2.0 (2022), 3.0 (in service), 4.0 (planned); Sleeper (2026) |
| Related trains | Namo Bharat Rapid Rail (formerly Vande Metro) |
Route, service, station and speed-average figures in the infobox are from our checked timetables; the rest are sourced in the sections that follow.
Name
“Vande Bharat” translates roughly as “Salute to India”. The working name of the prototype at ICF was Train 18; it was built in 2018. News reports date the renaming to 27 January 2019, when the then Railway Minister said the name came from public suggestions Source: The Week, 27 January 2019. We have not found a Ministry release for the naming itself.
People use several names for the same train. Indian Railways uses Vande Bharat Express for the daytime service and Vande Bharat Sleeper for the overnight one. In searches, signs and conversation it is also the Vande Bharat train, Vande Bharat trains, or just Vande Bharat; “Bande Bharat” is a common spelling, because “Vande” is often said “Bande” in Bengali, Odia and Assamese.
On this site, Vande Bharat Express without “Sleeper” means the Chair Car train. Most services in our data (150 of 170) carry the plain train name “Vande Bharat Express”; the rest, mainly Mumbai routes and the Sleepers, add the route to the name, such as “Mumbai CSMT - Madgaon Vande Bharat Express”.
History
The full story, with every date and source, is in the Vande Bharat history guide. In brief:
- 2018. ICF designed and built Train 18 in-house in 18 months, at a cost the Prime Minister’s Office put at “less than half of global prices” Source: PIB, 14 February 2019. The prototype was launched at ICF on 29 October 2018 and was described at the time as a successor to the Shatabdi Express Source: The Quint, 29 October 2018.
- 15 February 2019. The Prime Minister flagged off the first Vande Bharat Express from New Delhi to Varanasi via Kanpur and Prayagraj, timed at 8 hours Source: PIB, 14 February 2019. That route still runs as 22435/22436, and still takes 8 hours.
- 15 August 2021. The Prime Minister announced 75 Vande Bharat trains for the 75 weeks of the Amrit Mahotsav Source: PIB, 15 August 2021. The 75-train (150-service) count was reached, according to news reports, on 10 August 2025 Source: Deccan Herald.
- 30 September 2022. Vande Bharat 2.0 entered service between Gandhinagar and Mumbai Central Source: PIB, 27 September 2022.
- 16 September 2024. The first Vande Metro, Bhuj – Ahmedabad, was renamed Namo Bharat Rapid Rail and inaugurated Source: PIB, 16 September 2024.
- 17 January 2026. The first Vande Bharat Sleeper, Howrah – Kamakhya, was flagged off at Malda Town Source: PIB, 17 January 2026.
- November 2026. Two more Sleeper routes began, New Delhi – Varanasi Source: PIB, 30 October 2026 and Mumbai CSMT – SMVT Bengaluru Source: South Western Railway, bringing the network to 85 routes in our data.
Why the train was built, what it cost and how its targets compare with what happened are covered in Why Vande Bharat.
Design and technology
Trainset layout
A Vande Bharat train has no separate locomotive. The Ministry of Railways describes it as a “self-propelled semi-high-speed trainset” and says it “marks a shift from conventional locomotive-hauled trains to integrated train systems” Source: PIB backgrounder, 16 January 2026.
Traction motors are spread under coaches along the train, and there is a driving cab at each end, so the train reverses at a terminus without an engine being moved round. Because the electrical equipment sits under the floor, a 16-coach Vande Bharat seats 1,128 people, which the Ministry called “much more than the conventional Shatabdi rake of equal number of coaches” Source: PIB, 14 February 2019.
Speed and acceleration
The Ministry gives the Vande Bharat Express a “design speed of 180 kmph and maximum operating speed of 160 kmph” Source: PIB, 25 July 2025, and says the 160 km/h figure is “subject to route readiness” Source: PIB backgrounder. The second-generation train reaches 100 km/h from a standstill in about 52 seconds Source: PIB, 9 September 2022. Fast acceleration matters more than top speed on most Indian routes, where trains slow down often for stations, curves and speed limits.
Average speeds over a whole timetable are far lower than 160 km/h. In our data the fastest service, 22435 Varanasi – New Delhi, covers 771 km in 8 h, an average of 96.4 km/h; its return, 22436, matches it, and the second New Delhi – Varanasi pair, 22415/22416, averages 94.0 km/h.
We do not give an average speed for the four trains on the Konkan Railway, among them 22229 Mumbai CSMT – Madgaon, which takes 7 h 45 min. The distance listed for them is a fare distance, inflated by 40% Source: Konkan Railway, and not the length of the track. The slowest, 26502 Gorakhpur – Patliputra, averages 54.2 km/h over 384 km. The speed and fastest routes guide ranks every service.
Weight, energy and body
The first trainset weighed 430 tonnes and the second-generation one 392 tonnes; the 2.0 version also has air-conditioning about 15% more energy-efficient Source: PIB, 9 September 2022. Regenerative braking, which feeds power back to the overhead line when the train slows down, “can save up to 30% of electrical energy”, according to the Prime Minister’s Office Source: PIB, 14 February 2019.
A tender for 100 lighter aluminium-bodied trainsets with sleeping berths was not concluded after the lowest bidder and Indian Railways failed to agree on price Source: Railway Gazette, 15 August 2024.
Localisation
The government puts localisation at “around 90%” for trainsets built at ICF Source: PIB backgrounder. The 2019 release said the major systems “have been designed and built in India” with a large number of suppliers Source: PIB, 14 February 2019.
Safety systems
In a 2023 reply to Parliament, the Ministry listed the features of Vande Bharat trains as Kavach train protection, automatic plug doors, sealed gangways, reclining seats, a charging socket at every seat, CCTV in all coaches and a toilet for passengers with disabilities Source: PIB, 2 August 2023. Kavach is India’s own automatic train protection system. By July 2026 Kavach 4.0 had been commissioned on 2,490 route km of track Source: PIB, 23 July 2026.
Passenger facilities
Every seat has a charging socket and a reading light; toilets are bio-vacuum; EC seats rotate to face the direction of travel; doors are automatic and the gangways between coaches are sealed. The Vande Bharat facilities guide lists each item with its source, and food on Vande Bharat covers the meal you choose, or skip, when you book.
Versions
| Version | Entered service | What changed | Source |
|---|---|---|---|
| 1 | February 2019 | 16 coaches, 1,128 seats, up to 160 km/h | PIB, 14 February 2019 |
| 2.0 | September 2022 | Lighter (392 t), up to 180 km/h, 52 s to 100 km/h, more efficient AC | PIB, 9 September 2022 |
| 3.0 | In service by January 2026 | The Ministry says it is in operation but gives no first train | PIB backgrounder |
| 4.0 | Planned, “within 18 months from late 2025” | Kavach 5.0, better seats, toilets and finish | PIB backgrounder |
Variants
Vande Bharat Express (Chair Car)
The original and by far the largest variant: a day train with AC Chair Car and Executive Chair Car seats, for trips of roughly 270 to 880 km. CC has 3+2 seating with 78 seats in a normal coach and 44 in each driving coach; EC has 2+2 seating with 52 seats per coach.
An 8-coach train has 1 EC and 7 CC coaches and 530 seats, a 16-coach train has 2 EC and 14 CC coaches and 1,128 seats, and a standard 20-coach train has 2 EC and 18 CC coaches and 1,440 seats. Mumbai Central – Ahmedabad (22961/22962) is one of the 20-coach trains with this formation. See the Vande Bharat seat map for each coach layout.
Vande Bharat Sleeper
The overnight variant, with berths instead of seats. A Sleeper train has 16 coaches, 11 in 3A, 4 in 2A and 1 in 1A, for about 823 passengers Source: PIB, 1 January 2026. The prototype was unveiled at BEML in Bengaluru on 1 September 2024 Source: The Week (PTI), 1 September 2024, and the government plans 260 Sleeper trainsets built by BEML, ICF and technology partners in phases Source: The Tribune (ANI), 4 February 2026. Three Sleeper routes run in our data:
- Howrah – Kamakhya, 27575/27576, 966 km in 14 hours.
- New Delhi – Varanasi, 27421/27422, 758 km. See Delhi–Varanasi Sleeper.
- Mumbai CSMT – SMVT Bengaluru, 27651/27652, 1,114 km, the longest Vande Bharat journey of any kind. See Bengaluru–Mumbai Sleeper.
The Sleeper has its own booking rules (confirmed tickets only, no RAC, food in the fare). The Vande Bharat Sleeper guide explains them.
Vande Metro / Namo Bharat Rapid Rail
The Vande Bharat platform was also adapted for short commuter trips under the name Vande Metro. The first, Bhuj – Ahmedabad, was renamed Namo Bharat Rapid Rail and inaugurated on 16 September 2024 Source: PIB, 16 September 2024. By the end of 2025 two such services ran, Bhuj – Ahmedabad and Jaynagar – Patna Source: PIB Year End Review, 28 December 2025. They are commuter trains and are not counted among the Vande Bharat Express routes on this site.
Do not confuse Namo Bharat Rapid Rail with the Namo Bharat regional rapid transit trains between Delhi and Meerut. Those are run by NCRTC under the Ministry of Housing and Urban Affairs, on a separate line, and are not Indian Railways trains Source: NCRTC. The differences, along with the non-AC Amrit Bharat Express, are set out in Vande Bharat vs Namo Bharat vs Amrit Bharat.
Services and routes
Network size
In November 2026, after checking every timetable against two sources (erail.in and ConfirmTkt), our data has 85 Vande Bharat routes, each a pair of trains running in opposite directions, for 170 services. Of these, 82 routes (164 services) are Chair Car and 3 routes (6 services) are Sleeper. Together the trains stop at 425 different stations. The full list, with numbers, timings and running days, is on the Vande Bharat route list, and every service has its own page under /trains/.
The Ministry’s own most recent count, on 23 July 2026, was 162 Chair Car services and 2 Sleeper services Source: PIB, 23 July 2026; routes and Sleeper services added since account for the difference. A service is one train in one direction. The number of physical trainsets is a separate figure, because one set can work more than one service and spare sets are kept for maintenance; we found no official count of trainsets in service.
No Vande Bharat in our data runs every day of the week. 160 of the 170 services have one weekly off-day; the most common pattern is “daily except Tuesday” (58 services), followed by Wednesday (41) and Thursday (25). The other ten run on fewer days: four Pune services (20669/20670 to Hubballi and 20673/20674 to Kolhapur) three days a week, the Tatanagar – Patna pair 20893/20894 four days, and 21893 to 21896, also between Tatanagar and Patna, once a week. The running days checker shows the days for any train.
Routes by state
The table counts the routes that start or end in each state or Union Territory. A route between two states is counted once in each, so the column adds up to more than 85.
| State or UT | Routes | Guide |
|---|---|---|
| Uttar Pradesh | 14 | Uttar Pradesh |
| Delhi | 14 | From Delhi |
| Maharashtra | 13 | From Mumbai |
| Karnataka | 13 | Karnataka |
| Bihar | 11 | Bihar |
| West Bengal | 10 | From Howrah |
| Tamil Nadu | 8 | Tamil Nadu |
| Jharkhand | 8 | Jharkhand |
| Gujarat | 7 | Gujarat |
| Andhra Pradesh | 6 | Andhra Pradesh |
| Rajasthan | 6 | Rajasthan |
| Jammu and Kashmir | 5 | Delhi–Katra–Srinagar |
| Telangana | 5 | Telangana |
| Madhya Pradesh | 5 | Madhya Pradesh |
| Odisha | 5 | Odisha |
| Kerala | 3 | Kerala |
| Punjab | 3 | Delhi–Amritsar |
| Chhattisgarh | 2 | Bilaspur–Nagpur |
| Uttarakhand | 2 | Delhi–Dehradun |
| Assam | 2 | NJP–Guwahati |
| Goa | 2 | Mumbai–Goa |
| Himachal Pradesh | 1 | Delhi–Una |
| Chandigarh | 1 | Ajmer–Chandigarh |
Delhi and Uttar Pradesh lead because the oldest routes run out of New Delhi and many eastern routes end at Varanasi, Gorakhpur, Lucknow or Prayagraj. Counting stops rather than end points, the busiest Vande Bharat station in our data is Howrah Jn, served by 16 services, followed by Varanasi Jn, Patna Jn and Gaya Jn with 14 each, and New Delhi, Tatanagar Jn and Ambala Cantt Jn with 12 each.
Trains passing through a state without starting or ending there, such as those crossing Haryana at Ambala Cantt, are not counted in the table. To find a train between any two stations, use Vande Bharat trains between stations.
Longest, shortest, fastest and slowest
All figures are from our checked timetables, for full journeys.
| Record | Train | Figure |
|---|---|---|
| Longest journey (any) | 27651/27652 Mumbai CSMT – SMVT Bengaluru Sleeper | 1,114 km, 15 h 50 min / 16 h 10 min |
| Longest Chair Car | 26101/26102 Pune – Ajni (Nagpur) | 881 km |
| Shortest | 26401/26402 and 26403/26404 Jammu Tawi – Srinagar | 269 km, about 4 h 45 min to 4 h 50 min |
| Fastest average | 22435 Varanasi – New Delhi | 96.4 km/h |
| Slowest average | 26502 Gorakhpur – Patliputra | 54.2 km/h |
The middle Vande Bharat journey is 535 km, which shows what the Chair Car train is for: a day trip between two large cities, out in the morning and back by evening. The distance calculator gives the distance between any two stops, and what is Vande Bharat Express answers the “longest train” question in more detail.
Fares and classes
Vande Bharat fares are set by Indian Railways and sold through IRCTC and railway counters. The Ministry fixed the base fare at 1.4 times the Shatabdi base fare in CC and 1.3 times in EC Source: PIB factsheet, 15 February 2022, and says there is no plan to add dynamic pricing Source: PIB, February 2026. The total fare adds a reservation charge, a superfast charge, GST and, unless you opt out, the catering charge.
Fares we checked on IRCTC in November 2026, one adult, general quota:
| Example | Class | Total fare |
|---|---|---|
| Howrah – Puri, 22895, 502 km | CC | ₹1,485 |
| Howrah – Puri, 22895, 502 km | EC | ₹2,665 |
| Lowest in our data: Gomati Nagar – Ayodhya Dham, 22346, 127 km | CC / EC | ₹550 / ₹1,040 |
| Highest Chair Car: Ajni – Pune, 26102, 881 km | CC / EC | ₹2,160 / ₹3,830 |
| New Delhi – Varanasi Sleeper, 27422, 758 km | 3A / 2A / 1A | ₹1,915 / ₹2,470 / ₹3,030 |
EC costs about 1.7 to 1.9 times the CC fare on the same trip in our fare data. For the fare on any route see Vande Bharat ticket price or the fare calculator; for the Sleeper, the Sleeper fare calculator.
Which class to choose is covered in CC vs EC, and how to book, including Tatkal and the waiting list, in the booking guide, Vande Bharat Tatkal and Vande Bharat waiting list. Concessions for seniors, students and others are in concessions and quotas.
Operations
Indian Railways owns and runs every Vande Bharat train; it is not a private train. Day-to-day running is handled by the zonal railway responsible for each route. South Western Railway, for example, announced the Mumbai – Bengaluru Sleeper Source: South Western Railway, and some zones such as Southern Railway allow seats to be booked on the way up to shortly before departure (see the waiting list guide).
Train numbers follow the Indian Railways pattern: in our data 158 of the 164 Chair Car services have numbers starting 20, 22 or 26, and the three Sleeper pairs use 27xxx.
Tickets are sold on IRCTC, the official railway booking site and app, and at reservation counters. Rules for cancellation, refunds after a late running, changing a ticket and luggage are the general Indian Railways rules, with a few differences for the Sleeper. Live position and PNR checks are explained in PNR and running status.
We found no official, public breakdown of which depot maintains which trainset, so this page does not list maintenance depots.
Performance and reception
Occupancy
According to the Ministry, Vande Bharat services had carried more than 7.5 crore passengers across 274 districts by December 2025, with occupancy of 102.01% in 2024–25 and 105.03% in 2025–26 up to June 2025 Source: PIB backgrounder, 16 January 2026. In December 2025 the Railway Minister told the Lok Sabha that overall Vande Bharat occupancy was “around 100 per cent” Source: Devdiscourse (PTI), 3 December 2025. These are network averages; some routes run much fuller than others, and we have no official per-route figures.
Punctuality
We did not find an official punctuality figure for Vande Bharat trains alone, so this page gives none. The 2025 figures reported in Parliament cover all mail and express trains together.
Journey time
The Ministry says Vande Bharat trains have cut journey time “up to 45 percent on several corridors” and that New Delhi – Varanasi in about eight hours is “around 40 to 50 percent faster than earlier services on the route” Source: PIB backgrounder. How it compares with the trains it runs alongside is shown in Vande Bharat vs Shatabdi, vs Rajdhani, vs Tejas and vs other trains. An overall verdict for passengers is in the Vande Bharat review.
Criticism and problems
Speed limited by track. The gap between the 160 km/h rating and real averages of 54 to 96 km/h is the most common criticism. In 2025, only 21.8% of Indian Railways track (23,010 km) was cleared for 130 km/h or more; 56.6% was cleared for 110 to 130 km/h and 21.6% for less than 110 km/h Source: PIB, 25 July 2025.
Upgrades of the Delhi – Mumbai and Delhi – Howrah routes to 160 km/h were approved in August 2019 with a 2022–23 target Source: PIB, Delhi–Howrah; Source: PIB, Delhi–Mumbai.
Stone pelting. In July 2023 the Railway Minister told the Lok Sabha that stone pelting had caused ₹55.60 lakh of damage to Vande Bharat trains since 2019, with 151 arrests and no passenger deaths Source: ThePrint (PTI), 26 July 2023. In March 2025 he reported 7,971 stone-pelting incidents on trains including Vande Bharat from 2023 to February 2025, with 4,549 arrests Source: OrissaPOST, 19 March 2025.
Animal hits. Collisions with cattle were a frequent problem in the train’s early years. The Minister reported 68 such cases between 1 June and December 2022 Source: Swarajya, December 2022, and said in April 2025 that cases had dropped sharply after about 900 km of track was fenced Source: Ritam, 2 April 2025.
Fare and targets. The base fare is higher than the Shatabdi’s, as set out above, and both early fleet targets came late: 75 trains within the Amrit Mahotsav, which ran until 15 August 2023, was reached in August 2025, and the 2022 Budget’s “four hundred new-generation Vande Bharat Trains” in three years Source: PIB, 1 February 2022 has not been met. The Sleeper also arrived well after its 2024 prototype; the Sleeper guide describes the reported quality problems behind the delay.
Timeline
| Date | Event | Source |
|---|---|---|
| October 2018 | Train 18 rolls out of ICF Chennai | The Quint |
| 27 January 2019 | Train 18 named Vande Bharat Express (reported) | The Week |
| 15 February 2019 | First Vande Bharat flagged off, New Delhi – Varanasi | PIB |
| 15 August 2021 | Target of 75 Vande Bharat trains announced | PIB |
| 1 February 2022 | Budget announces 400 new-generation Vande Bharat trains in three years | PIB |
| 30 September 2022 | Vande Bharat 2.0 starts, Gandhinagar – Mumbai Central | PIB |
| July 2023 | 50 Vande Bharat services | PIB |
| 12 March 2024 | 10 new Vande Bharat trains flagged off in one day | PIB |
| 1 September 2024 | Vande Bharat Sleeper prototype unveiled at BEML, Bengaluru | The Week (PTI) |
| 16 September 2024 | First Vande Metro opens as Namo Bharat Rapid Rail, Bhuj – Ahmedabad | PIB |
| 10 August 2025 | 75 Vande Bharat trains (150 services) reached (reported) | Deccan Herald |
| 16 January 2026 | 164 Vande Bharat services; 800-trainset target for 2030 | PIB |
| 17 January 2026 | First Vande Bharat Sleeper flagged off, Howrah – Kamakhya | PIB |
| 23 July 2026 | 162 Chair Car and 2 Sleeper services; Kavach 4.0 on 2,490 route km | PIB |
| 2–3 November 2026 | New Delhi – Varanasi and Mumbai – Bengaluru Sleepers start | PIB, SWR |
| November 2026 | 85 routes, 170 services in our checked timetables | Route list |
Looking ahead, the Ministry’s stated targets are “about 800 Vande Bharat trainsets by 2030, subject to infrastructure readiness and manufacturing capacity” and around 4,500 by 2047 Source: PIB backgrounder. Changes as they happen are logged on Vande Bharat updates.
Vande Bharat wiki FAQs
What is the Vande Bharat Express? India’s semi-high-speed, fully air-conditioned train, built by ICF Chennai and run by Indian Railways. It has no separate engine, is designed for 180 km/h and runs at up to 160 km/h where the track allows.
Who manufactures Vande Bharat trains? The Integral Coach Factory in Chennai designed and builds the Chair Car trains. The Vande Bharat Sleeper prototype was built at BEML in Bengaluru, and future Sleeper trains are planned from BEML, ICF and technology partners.
When did the first Vande Bharat Express run? It was flagged off on 15 February 2019 between New Delhi and Varanasi. The same route runs today as 22435/22436 in 8 hours.
How many Vande Bharat trains are there? In November 2026, 85 routes and 170 services in our checked timetables: 82 Chair Car routes and 3 Sleeper routes. The Ministry’s last count, from July 2026, was 162 Chair Car and 2 Sleeper services.
What is the top speed of the Vande Bharat train? Design speed 180 km/h, maximum service speed 160 km/h. The fastest timetable average is 96.4 km/h, on 22435 Varanasi – New Delhi and its return 22436.
How many coaches and seats does a Vande Bharat have? Chair Car trains have 8, 16 or 20 coaches with 530, 1,128 or 1,440 seats. A Sleeper train has 16 coaches and about 823 berths.
Which state has the most Vande Bharat routes? Uttar Pradesh and Delhi, with 14 routes each starting or ending there, followed by Maharashtra and Karnataka with 13 each.
Is Vande Bharat a bullet train? No. It runs on the existing broad-gauge network shared with other trains. India’s bullet train is a separate high-speed line between Mumbai and Ahmedabad.
Is there a Vande Bharat page on Wikipedia? Yes, Wikipedia has an article on the Vande Bharat Express. This page is our own reference, written from Ministry of Railways releases and our checked timetables, with a source for each outside fact.
What does Vande Bharat mean? Roughly “Salute to India”. The name replaced the prototype’s working name, Train 18, in January 2019.
See also
- What is Vande Bharat Express
- Vande Bharat history and milestones
- Why Vande Bharat was built
- Vande Bharat facilities
- Vande Bharat speed and fastest routes
- Vande Bharat route list
- Vande Bharat Sleeper
- Vande Bharat seat map and CC vs EC
- Vande Bharat ticket price and booking guide
- Vande Bharat vs Namo Bharat vs Amrit Bharat
- Vande Bharat pilgrimage trains
- Vande Bharat train images
- Vande Bharat time table tool
References
- PIB (Prime Minister’s Office), first Vande Bharat and ICF build, 14 February 2019: https://pib.gov.in/PressReleasePage.aspx?PRID=1564577
- The Quint, Train 18 launch at ICF, 29 October 2018: https://www.thequint.com/news/india/made-in-india-semi-high-speed-train-18
- The Week, Train 18 named Vande Bharat Express, 27 January 2019: https://www.theweek.in/news/biz-tech/2019/01/27/Train-18-named-Vande-Bharat-Express-Piyush-Goyal.html
- PIB, 75 Vande Bharat trains announcement, 15 August 2021: https://www.pib.gov.in/PressReleasePage.aspx?PRID=1746062
- Deccan Herald, 75 trains (150 services) reached, August 2025: https://www.deccanherald.com/india/vande-bharat-trains-in-india-increases-to-150-rail-minister-ashwini-vaishnaw-3674312
- PIB, Union Budget speech, 1 February 2022: https://www.pib.gov.in/PressReleasePage.aspx?PRID=1794167
- PIB, Vande Bharat fare factsheet, 15 February 2022: https://static.pib.gov.in/WriteReadData/specificdocs/documents/2022/feb/doc202221515601.pdf
- PIB, second-generation Vande Bharat, 9 September 2022: https://www.pib.gov.in/PressReleasePage.aspx?PRID=1858098
- PIB, Vande Bharat 2.0 flag-off, 27 September 2022: https://www.pib.gov.in/PressReleasePage.aspx?PRID=1862476
- PIB, Lok Sabha reply on features and services, 2 August 2023: https://www.pib.gov.in/PressReleasePage.aspx?PRID=1945080
- PIB, 10 Vande Bharat trains flagged off, 12 March 2024: https://pib.gov.in/PressReleasePage.aspx?PRID=2014000
- Railway Gazette, aluminium trainset tender, 15 August 2024: https://www.railwaygazette.com/traction-and-rolling-stock/indian-railways-to-re-run-vande-bharat-40-train-procurement/67142.article
- PIB, Namo Bharat Rapid Rail inauguration, 16 September 2024: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2055409
- PIB, design and operating speed and track speed classes, 25 July 2025: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2148364
- PIB, Year End Review, 28 December 2025: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2209199
- PIB, Vande Bharat Sleeper coaches, 1 January 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2210517
- PIB, backgrounder on Vande Bharat, 16 January 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2215265
- PIB, first Vande Bharat Sleeper, 17 January 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2215594
- The Tribune (ANI), 260 Sleeper trainsets planned, 4 February 2026: https://www.tribuneindia.com/news/ashwini-vaishnaw/govt-plans-to-manufacture-260-vande-bharat-sleeper-trainsets-ashwini-vaishnaw
- PIB, no dynamic fare on Vande Bharat, February 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2226596
- PIB, route count and Kavach 4.0, 23 July 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2288381
- PIB, New Delhi – Varanasi Sleeper, 30 October 2026: https://www.pib.gov.in/PressReleasePage.aspx?PRID=2330492
- NCRTC, Delhi – Meerut Namo Bharat corridor: https://ncrtc.in/honble-pm-inaugurated-balance-sections-of-namo-bharat-corridor-meerut-metro/
- Devdiscourse (PTI), Lok Sabha reply on occupancy, 3 December 2025: https://www.devdiscourse.com/article/business/3718465-overall-punctuality-of-mail-express-trains-was-80-in-2025-26-vaishnaw
- PIB, Delhi – Howrah speed upgrade, August 2019: https://pib.gov.in/PressReleasePage.aspx?PRID=1581392
- PIB, Delhi – Mumbai speed upgrade, August 2019: https://pib.gov.in/PressReleasePage.aspx?PRID=1581394
- ThePrint (PTI), stone pelting damage, 26 July 2023: https://theprint.in/india/railways-lost-rs-55-60-lakh-in-damages-to-stone-pelting-on-vande-bharat-trains-since-launch-rail-minister/1686965
- OrissaPOST, stone pelting incidents, 19 March 2025: https://www.orissapost.com/7971-stone-pelting-incidents-on-trains-including-vande-bharat-since-2023-government/
- Swarajya, cattle hits, December 2022: https://swarajyamag.com/amp/story/news-headlines/68-cases-of-cattle-hit-on-vande-bharat-trains-since-june-2022
- Ritam, fall in cattle hits after fencing, 2 April 2025: https://ritamdigital.com/2025/04/02/67224/nation/vande-bharat-express-sees-sharp-decline-in-cattle-collisions-after-new-railway-fencing-minister-vaishnaw
- The Week (PTI), Sleeper prototype unveiled at BEML, 1 September 2024: https://www.theweek.in/wire-updates/national/2024/09/01/mds4-ka-minister-ld-vande-bharat.html
- South Western Railway, Mumbai CSMT – SMVT Bengaluru Sleeper notice: https://swr.indianrailways.gov.in/documents/press-release/preview/1379
Timetables, distances, running days, stop counts and station counts: our checks of all 170 Vande Bharat services against erail.in and ConfirmTkt, November 2026. Fares: IRCTC fare enquiry, November 2026. Coach and seat counts: RDSO Vande Bharat trainset maintenance manual, as used in what is Vande Bharat Express. Report a correction.
Keep reading about Vande Bharat

Vande Bharat Routes: Full Vande Bharat Express Route List
All 82 Vande Bharat Chair Car routes and 3 Sleeper routes in India, with train numbers and station codes, grouped by state. Updated November 2026.

How to Book a Vande Bharat Ticket on IRCTC
How to book a Vande Bharat Express ticket on IRCTC: when booking opens (60 days, 08:00 IST), CC or EC, meals, Tatkal at 10:00 and Sleeper booking rules.
